sitelogo
 Home»Quantity Survey» Assessment of factors influencing time performance of building projects in Nigeria construction industry

Assessment of factors influencing time performance of building projects in Nigeria construction industry

 Department: Quantity Survey  
 By: usericon mattkings  

 Project ID: 1836
   Rating:  (3.3) votes: 20
Rate this project
   Price:₦1000
Abstract
The construction industry is suffering from a major issue of time overruns or delay which causes considerable losses to projects and drastically influences project success. Shortage of skills of manpower, poor supervision, poor site management, unsuitable leadership, shortage and breakdown of equipment among others contribute to construction delays. However, little or no efforts have been made to curtail the phenomenon. It is against this background that this research work attempts to study the factors that are responsible, so as to identify them and proffer possible ways of tackling the menace. The study attempts this through chosen professionals as population and samples were drawn to this effect at random from the category of professionals, using sampling design and procedures methods. The data were collected from a primary source consisting of clients, consultants, and contractors in the construction industry. A total of fifty (50) questionnaires were administered in which forty (40) were retrieved, thirty-six (36) of these complete questionnaires were used for the analysis. The Data analysis was done with statistical software package SPSS from data collected from the retrieved questionnaires in which are converted into numeric data. The study concluded with recommending proper planning work, committed leadership and management, sending clear and complete message to workers to ensure effective communication and hiring skilled workers to achieve good progress, as a panacea for effective time performance on sites....
Preview +
Other Quantity Survey project topics and materials you might be interested in
»An examination of the role of value engineering analysis in the construction industry
»Assessment of factors influencing time performance of building projects in Nigeria construction industry
»The impact of interim valuation-certificate in construction project delivery
»Involvement of quantity surveyor in railway construction project cost in the Nigerian railway corporation, Niger state
»Risk management practice in construction project (a case study of Ebonyi state)
»Assessment of the environmental impact of construction works
»Appraisal of cost management practices in the delivery of capital projects in Nigeria
»Productivity improvement of projects in the Nigerian construction industry
»An assessment of the participation of female quantity surveyor in professional practice in Bida and Minna areas of Niger state
»Estimating and budgeting a medium scale building project
»The comparative analysis of recreational facilities for housing estates
»Taking off processes and preparation of an un-priced bill of quantities
»The effects of existing bid selection on public buildings construction projects in Kaduna state
»The effect of maintenance cost on the rent of commercial buildings - a case study of some selected buildings in Kaduna state
»An appraisal of the effects of government legislations and policies on building development in Nigeria

Upload Project

Do you have project materials to share? Upload and earn with it.

Departments